
Planning Permission: Planning Application submitted to London Borough of Hackney on 5th November 2010 for 100% change of use from a cultural workshop development to C3 residential usage. Full demolition of existing buildings and 9 Unit new build scheme to be constructed. Please refer to the full Design and Access Report PDF (below right under the image). Decision expected: January 2011.
A Pre–Application Design and Access Report was submitted to London Borough of Hackney on 30th July 2010. This was favourably considered by the council, which will in turn assist the planning application's timescale.